With a grant of $3,649 from the Shire of Capel the LTFRG was able to construct some much needed water infrastructure for Ludlow North.
The work included:
Recommissioning the grit tank to improve water quality
Installation of a new water pipe to the adjacent eight (8) homes
Installation of two (2) water taps and two (2) fire fighting outlets at each of the homes
Recommission the fire truck filling point at the northern most point of the settlement